|
Citroën Xantiasince 1993 releaseRepair and operation of the car |
|
Citroën Xantia + Introduction + Operation manual + Routine maintenance - Repair of the engine + The repair procedures which are not demanding extraction of the engine from the car - petrol engines + The repair procedures which are not demanding extraction of the engine from the car - diesel engines - Removal and capital repairs of the engine Capital repairs of the engine - the general information Removal of the power unit - methods and precautionary measures Removal, partition and installation of the power unit - model with RKPP Removal, partition and installation of the power unit - model with AT Order of dismantling of the engine by preparation it to carrying out capital repairs Dismantle of a head of cylinders Cleaning and check of a condition of a head of cylinders and components of the valvate mechanism Assembly of a head of cylinders Removal of conrod and piston assemblies Removal of a bent shaft Cleaning and check of a condition of the block of cylinders/case of the engine Check of a condition of conrod and piston assemblies Check of a condition of a bent shaft Check of a condition of inserts of radical and conrod bearings of a bent shaft Engine assembly order after performance of capital repairs Installation of piston rings Installation of a bent shaft and check of working gaps of radical bearings Installation of conrod and piston groups on the engine and check of working gaps of conrod bearings Initial start of the engine after completion of its capital repairs + Cooling systems, heating + Power supply system and release + Engine electric equipment + Coupling + Transmission + Power shafts + Uniform hydraulic system + Brake system + Running gear and steering + Body and finishing of salon + Onboard electric equipment + Schemes of electric equipment |
Order of dismantling of the engine by preparation it to carrying out capital repairs It is the simplest to make dismantling and service of the engine after installation it on the portable assembly stand. Such stands can always be rented in a workshop of car service. Before installation of the engine on the stand it is necessary to remove from it a flywheel / a driving disk that fixing bolts could be screwed in the face surface of the block of cylinders. In the absence of a possibility of use of the assembly stand it is necessary to take care of arrangement of a strong metalwork workbench. As a last resort, dismantling and repair of the engine can be made on a garage floor. Prepare also pair of strong wooden blocks for installation of the engine on them. In case of performance of work without use of the stand try not to strike the engine and not to drop it. If you managed to buy the restored engine, it is necessary to rearrange on it with old all hinged units and components. Such components are among:
If there is a possibility of acquisition of the reduced set of the engine consisting of the block of cylinders, a bent shaft and rods with pistons (all assembled), it is necessary to remove from the old unit also a head of cylinders, the case pallet, the oil pump and a gas-distributing belt. By preparation for performance of complete capital repairs dismantling of the engine is recommended to be made in the following order (see appropriate section of the present Chapter if other addressing is not given in brackets): Before dismantling of the engine and preparation it to capital repairs make sure available all necessary tools and materials. More detailed information is stated in the section Tools and the equipment of a workplace. |
On the homepage
|