|
Citroën Xantiasince 1993 releaseRepair and operation of the car |
|
Citroën Xantia + Introduction + Operation manual + Routine maintenance + Repair of the engine + Cooling systems, heating - Power supply system and release + A power supply system - petrol models - A power supply system - diesel models Filling of a power supply system with fuel and removal from it air traffic jams Check and adjustment of the maximum turns of the engine Removal, installation and adjustment of the thermosensitive RPM meter of bystry idling The electromagnetic locking valve - general information, removal and installation Removal and TNVD installation Methods of check of installation of the moments of injection of fuel Check and adjustment of the moments of injection (TNVD Lucas) Check and adjustment of the moments of injection (TNVD Bosch) Check of serviceability of functioning, removal and installation of nozzles of injection of fuel Removal, installation and adjustment of a cable of gas Removal and installation of the accelerator pedal Removal and installation of assembly of a toplivozabornik with fuel consumption sensor Removal and installation of the fuel tank Removal and installation of the inlet pipeline and final collector Turbocompressor - general information and precautionary measures Removal and installation of a turbocompressor Check of a state and recovery repair of a turbocompressor Removal and installation of the built-in cooler of a turbocompressor Removal and installation of the air cleaner and the accompanying components + Systems of decrease in toxicity and production of the fulfilled gases + Engine electric equipment + Coupling + Transmission + Power shafts + Uniform hydraulic system + Brake system + Running gear and steering + Body and finishing of salon + Onboard electric equipment + Schemes of electric equipment |
The electromagnetic locking valve - general information, removal and installation
General information
At failure of the locking valve temporary start of the engine can be made by removal of the valve (see below), extraction of a plunger from it with a spring and installations into place without internal components. The wire should be wound so that it did not adjoin to weight. To kill the engine after such start it is necessary to use the lever of a manual stop on TNVD (see the Power supply system - diesel models), or to switch off ignition on transfer. Removal
Installation Installation is made upside-down. Do not forget to replace a sealing washer / ring of the valve. Track respect for the required effort of tightening. If the detachment of a driving cable of bystry idling was made, execute its adjustment (see Removal, installation and adjustment of the thermosensitive RPM meter of bystry idling). |
On the homepage
|