Citroën Xantia

since 1993 release

Repair and operation of the car



Citroën Xantia
+ Introduction
+ Operation manual
+ Routine maintenance
+ Repair of the engine
+ Cooling systems, heating
- Power supply system and release
   - A power supply system - petrol models
      Removal and installation of assembly of the air cleaner
      Removal, installation and adjustment of a cable of gas
      Removal and installation of the accelerator pedal
      Unleaded fuel - the general information and rules of use
      Systems of injection of fuel - the general information
      Dropping pressure in a power supply system
      Removal and installation of the fuel pump
      Removal and installation of the sensor of fuel consumption
      Removal and installation of the fuel tank
      Check of a state and adjustment of system of injection of fuel
      Removal and installation of the case of a throttle
      Removal and installation of components of the Bosch Motronic 5.1 system
      Removal and installation of components of the Magneti-Marelli 8P system
      Removal and installation of the inlet pipeline
      Removal and installation of a final collector
   + A power supply system - diesel models
   + Systems of decrease in toxicity and production of the fulfilled gases
+ Engine electric equipment
+ Coupling
+ Transmission
+ Power shafts
+ Uniform hydraulic system
+ Brake system
+ Running gear and steering
+ Body and finishing of salon
+ Onboard electric equipment
+ Schemes of electric equipment


04d84ca1



Removal and installation of a final collector

Removal

L models 1.6 and 1.8

 PERFORMANCE ORDER

1. Disconnect a hose of supply of hot air from the screen of a collector and remove it from the car.
2. Turn out three fixing screws and remove the screen from the top part of a final collector.
3. Prop up antiretractable boots back wheels, then a front of the car and establish to a poddomkratta it on props.
4. In case of need disconnect an electrical wiring from the oxygen sensor (l-probe). Alternatively, prop up a reception pipe of system of production of the fulfilled gases in order to avoid sensor electrical wiring stretching.
5. Give nuts of fastening of a reception pipe to a final collector. Turn out a bolt of fastening of a pipe to a basic arm. Separate a pipe from a collector flange, remove laying.
6. Give eight nuts of fastening of a final collector to a head. Take a collector from a motive compartment, remove sealing laying.

Models of 2.0 l

 PERFORMANCE ORDER

1. Prop up antiretractable boots back wheels, then a front of the car and establish to a poddomkratta it on props.
2. Give two nuts of fastening of a reception pipe to a final collector. Remove springs with the cups, take bolts and separate a pipe from a collector flange. Remove laying.
3. Give eight nuts of fastening of a final collector to a head. Take a collector from a motive compartment, remove sealing laying. Pay attention to the remote pro-rates established between laying and the pipeline.

Installation

Installation is made upside-down. Pay attention to the next moments:
   a) Check a condition of hairpins of fastening of a collector, clean and restore a carving;
   b) Make sure of absoluteness of dryness and purity of the interfaced surfaces of a collector and a head of cylinders, check their planeness. Do not forget to replace laying (and). All fixture has to be tightened with the required effort;
   c) You make connection of a reception pipe of system of production of the fulfilled gases to a final flange of a collector according to the instructions provided in the section of System of decrease in toxicity and production of the fulfilled gases.


On the homepage