Citroën Xantia

since 1993 release

Repair and operation of the car



Citroën Xantia
+ Introduction
+ Operation manual
+ Routine maintenance
+ Repair of the engine
- Cooling systems, heating
   Detachment and replacement of hoses of the cooling system
   Removal, check of a state and installation of a radiator
   Removal, check of serviceability of functioning and installation of the thermostat
   Check of serviceability of functioning, removal and installation of the fan(s) of the cooling system
   Check of serviceability of functioning, removal and installation of electric switches and sensors of the cooling system
   Removal and installation of the water pump
   Removal and installation of a casing of the thermostat / fuel filter (diesel models)
   System of heating/ventilation of salon - the general information
   Removal and installation of components of system of heating/ventilation of salon
   The air conditioning system - the general information and precautionary measures
   Removal and installation of components of the air conditioning system
+ Power supply system and release
+ Engine electric equipment
+ Coupling
+ Transmission
+ Power shafts
+ Uniform hydraulic system
+ Brake system
+ Running gear and steering
+ Body and finishing of salon
+ Onboard electric equipment
+ Schemes of electric equipment


04d84ca1



Removal and installation of a casing of the thermostat / fuel filter (diesel models)

Removal

New sealing laying will be required.


 PERFORMANCE ORDER

1. Disconnect a negative wire from the battery.
2. Empty the cooling system (address the Head Routine maintenance).
3. Remove the fuel filter (address the Head Routine maintenance).

Cover with polyethylene a dome of transmission and a starter in order to avoid hit on them the spilled fuel.

4. Disconnect an electrical wiring from the sensors of the cooling system screwed from above in a thermostat casing.
5. Disconnect hoses of a cooling path from a plastic casing of the thermostat.
6. Disconnect a hose of a cooling path from a branch pipe on the back party of a casing.

7. Turn out a bolt of fastening of a plastic casing of the fuel filter to the main casing of the thermostat.

8. Take a plastic casing and remove a sealing ring from its basis.



9. Turn out three fixing bolts and remove the main casing from a head of cylinders. Remove sealing laying.

10. Disconnect a hose from the basis of a casing and take the last from a motive compartment.

Installation

Installation is made upside-down. Pay attention to the next moments:
   a) Check a condition of the sealing ring established on the basis of a plastic casing, in case of need make replacement;
   b) Do not forget to change laying at installation of the main casing;
   c) Track correctness of laying and reliability of fastening of all hoses;
   d) You make gas station of the cooling system according to the instructions provided in the Head Routine maintenance;
   e) In conclusion do not forget to fill a power supply system (see the Head of the Power supply system and release).


On the homepage