1. Make sure of absoluteness of purity and dryness of the interfaced surfaces of the pump and block of cylinders. 2. Install the pump on the regular place (do not forget to replace laying). 3. Establish a GRM drive belt (see appropriate section of the Head Remont of the engine). 4. Fill the cooling system (address the Head Routine maintenance). |